Design and Construction of Buildings

Gradnja

PROCEDURE FOR OBTAINING LICENCES (for information purposes only):

The Construction Act (OG 153/13, 20/17, 39/19, 125/19) and the Physical Planning Act (OG 153/13, 65/17, 114/18, 39/19, 98/19) regulate the design, construction, use and maintenance of buildings and the implementation of administrative and other associated procedures.

E-PERMIT

The Ministry of Physical Planning, Construction and State Property has developed the ePermit system, allowing for the electronic issuing of all building permits and use permits.

PURPOSE OF THE PLOT

Checking the permitted types of construction or reconstruction can be done by inspecting the relevant urban physical plan. Urban physical plans can be viewed in the Spatial Planning Information System.

LOCATION INFORMATION

Information on the purpose of areas and conditions for implementing physical interventions from urban physical plans on specific land lots are available from competent state offices for physical planning and construction or using the e-Permit system by entering location information.

PROOF OF LEGAL INTEREST

Based on the physical planning document, if the planned construction/reconstruction is permitted, proof of legal interest in the construction project must be obtained. Proof of legal interest includes the following documents:
– Land register excerpt indicating that the investor is owner or holder of rights to build on the respective building lot or building,
– Pre-contract, contract or a conditional contract pursuant to which the investor has acquired or shall acquire the ownership right or building right,
– The decision of the competent authority on the basis of which the investor acquired ownership rights or building rights,
– A partnership agreement concluded with the property owner, with the goal of joint construction,
– Written approval from the landowner or the owner of the existing construction work, and consent from the body responsible for state property management for real estate managed by the Ministry of Physical Planning, Construction and State Assets pursuant to Article 71 of the State Property Management Act (OG 52/18),
– Written consent from the fiduciary owner given to the previous property owner who is the investor.

MAKING THE MAIN DESIGN PROJECT

The main design project is a set of systematically compliant projects incorporating a technical solution for the respective building and proving fulfilment of basic requirements for the building and other stipulated and determined requirements and conditions.

LOCATION PERMIT

The location permit is issued exclusively for the following interventions in the area:
– Exploitation field, except for exploitation fields containing hydrocarbons or geothermal water for energy purposes, construction of mining facilities and plants intended for mining, hydrocarbon storage and permanent disposal of gases in geological structures,
– Mining facilities and installations for the production of hydrocarbons or geothermal water for energy purposes in accordance with the physical plan of the exploitation field given on the basis of a special law governing the exploration and exploitation of hydrocarbons,
– The establishment of new military sites and military buildings,
– Projects in the area, which according to special regulations governing construction, are not considered construction projects,
– Stage and/or phased construction of the building,
– Complex intervention in area,
– Construction on land or construction for which the investor has not resolved property relations or for which expropriation is required, and
– Construction of buildings if the party so requests.

Issuance of a location permit is initiated at the request of the interested party and is to be accompanied by:
– The conceptual design in electronic form,
– Printout of the conceptual design certified by the design engineer,
– Decision on the environmental acceptability of the project, if the project is under special regulations subject to the procedure of environmental impact assessment and/or appropriate assessment of the impact of a project on the ecological network,
– Decision on the assessment of the need for environmental impact assessment if that decision contains protection measures and/or environmental monitoring program, and
– Certificate on validation of the conceptual design, if the project was developed according to foreign regulations.

Conceptual design – In the case of a building/construction work for which a location permit shall be obtained, a conceptual design has to be developed. The surveying design shall be an integral part of the conceptual design for a location permit, which establishes the forming of a building plot or position of one or more construction works on the building plot. The surveying design shall be developed as a separate part of the conceptual design.

The application for the issuance of a location permit is submitted to the competent office for construction and physical planning or via the ePermit system.

BUILDING PERMIT

A building permit is required to start the (re)construction of a building. The building permit application is submitted by the investor, and is to be sent to the competent construction and physical planning office in the place where the (re)construction of the building is planned. The application can also be submitted electronically via the ePermit system.

The building permit application for which a location permit is not issued according to special law is to be accompanied by:
– The main project in electronic form,
– A printout of the main project certified by the design engineer and chief design engineer if a number of design engineers participated in the design process, in electronic form, and signed using an electronic signature,
– Printout of the Energy Performance Certificate for the building certified by the design engineer and main design engineer if several designers participated in its preparation,
– A written report on an audit of the main project (if an audit is stipulated),
– Certificate on the main design validation (if the project was drafted according to foreign regulations),
– Proof of legal interest in issuing a building permit,
– Proof that the applicant may be an investor (concession, consent or other act stipulated by special regulations), if it is a building for which special law prescribes who the investor may be,
– Proof that the owner of the construction lot has fulfilled the duty of transferring a part of the land lot to the ownership of a local self-government unit, i.e., has fulfilled its duty to enter into an agreement on establishing service of transit and/or passage, as stipulated by special law governing physical planning, if such a duty exists.

The building permit ceases to be valid if the investor does not begin construction within three years from the starting date of permit validity.

Validity of the building permit is extended at the request of the investor once for the next three years if conditions for implementing interventions in the area defined in the physical plan, i.e., location permit as the basis for issuing the building permit, have not changed.

NOTICE OF COMMENCING CONSTRUCTION, STAKING OUT AND DESIGNATING THE CONSTRUCTION SITE

The commencement or continuation of construction must be reported in writing to the competent construction and physical planning office no later than eight days before commencing or continuing construction. This can also be done via the ePermit system. Prior to commencing construction, the investor is obliged to ensure the staking out of the building as well as fencing and designating the construction site with a notice board.

DEADLINE FOR COMPLETION OF THE BUILDING

The Construction Act stipulates that the building must, in terms of its external appearance and arrangement of the construction lot, be completed within:
– Ten years (Group 1 buildings – buildings covered by the National Physical Development Plan),
– Seven years (buildings for Groups 2.a and 2.b – buildings for which special conditions have been determined),
– Five years (buildings for Groups 3.a and 3.b – buildings for which no special conditions have been determined, residential buildings with a gross floor area (GFA) less than 400 m2 and agricultural buildings where the gross floor area is less than 600 m2).

ENERGY CERTIFICATE

Before issuing the use permit, the investor or the owner of the building is obliged to obtain an energy certificate for the building, unless otherwise stipulated in the Construction Act.

USE PERMIT

The (re)constructed building can be put to use or commissioned, and an official approval given for it to perform activities as stipulated by special law, only after the use permit has been issued for the respective building or facility. The application for the use permit is submitted by the investor, i.e., the owner of the building or facility, to the competent body for administrative affairs covering construction or via the ePermit system.

The application for issuing the use permit shall be accompanied by the following:
– A copy of the building permit, i.e., a copy of the main design for the building to be built or works to be performed without a building permit based on the main design,
– Data on entities participating in the construction process,
– A written statement on works and conditions for building maintenance,
– Final construction report from the supervising engineer,
– Statement from a chartered geodetic engineer that the building is located on the building lot, i.e., within the scope of the project in accordance with the building permit or main design,
– A geodetic project of the derived state of the building or surveying study and/or any other act determined by special regulations on the basis of which the buildings and other building in the cadastre or cadastre of the infrastructure and the land register are recorded, i.e. the way of using the plot with the data on the broken points of the building, the building particle i.e. the scope of the project in the space presented in GML format in electronic form;,
– Proof that the plot was formed in the cadastre, if it is a building which has the scope of intervention area determined in the location permit, within which plot is formed in parcelling, except for the issuing of the temporary use permit,
– Building energy certificate, if an application is submitted for a building that must meet energy efficiency requirements.

TECHNICAL INSPECTION

The Ministry, i.e., the competent administrative body, is obliged to perform a technical inspection of the building within thirty or fifteen days from the day of receiving a valid application for the issuance of a use permit. Technical inspection is performed to determine whether the constructed building complies with the building permit, i.e., the main design.

For more information, please contact the Ministry of Physical Planning, Construction and State Property of the Republic of Croatia: