HR EN
10. Osijek-Baranja County

Population: 250.767
GDP per capita: 15.228,00 EUR
Unemployment rate: 13,60%
Average Gross Salary: 1.681,00 EUR
Average Net Salary: 1.246,00 EUR

Distances from traffic infrastructure

Road: 0 km
Highway: A3, 20 km
Railway siding: in the zone itself, 0 km
Sea port: Rijeka, 450 km
Airport: Osijek, 10 km

Companies in the zone

Jabil (LogExpert Five)
Activity: High technology
Country of origin: United States of America
Company website: www.jabil.com

RDC
Activity: Regional distribution center
Country of origin: Republic of Croatia
Company website: https://rdc-obz.hr

Lukenda transport Ltd.
Activity: Transport
Country of origin: Republic of Croatia
Company website: https://lukenda-transport.hr

Messer Croatia plin Ltd.
Activity: Industrial gases
Country of origin: Federal Republic of Germany
Company website: www.messer.hr

Inspecto Ltd.
Activity: Quality control
Country of origin: Republic of Croatia
Company website: www.inspecto.hr

Iver Ltd.
Activity: Construction
Country of origin: Republic of Croatia
Company website: www.iver.hr

Delecto Ltd.
Activity: Work clothes
Country of origin: Republic of Croatia
Company website: www.delecto.hr

Agrotok Ltd.
Activity: Agricultural machinery
Country of origin: Republic of Croatia
Company website: www.agrotok.hr

Comcross Croatia Ltd.
Activity: Construction of 5G networks
Country of origin: Federal Republic of Germany
Company website: www.comcross-croatia.hr

OS metal Ltd.
Activity: Production of assembly halls
Country of origin: Republic of Croatia
Company website: www.osmetal.hr

Business zone Nemetin (Osijek) Download as PDF

General information

Location (city/municipality) City of Osijek
Zone type Business zone
Area of the zone (m²) 926.466
Available land (m²) 360.000
Land use Manufacturing and services
Building coverage ratio 0,6
Floor area ratio 2.0 for production buildings (3.0 for business)
Allowed construction height (m) 6 above-ground floors (for business) and 4 above-ground floors (for production)
Allowed noise level (at the border of the site, dB) 65 days, 50 nights
Diagram of the zone
Scanned copy of cadastral plan extract with highlighted available lots

Utility infrastructure

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability Yes
Water purifier Yes

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR/m³) Released
Communal contribution for office spaces (EUR/m³) Released
Communal contribution for services (EUR/m³) Released
Redemption from paying communal contribution fee Yes, from January 1, 2022
Communal contribution tax
Amount of communal contribution tax (EUR/m²) Manufacturing activities = 0.13012011, other activities = 0.29782998
Redemption from paying communal contribution tax No
Water fee
Water regulation fee (EUR/m²) Manufacturing activities (T2) = 0.039817, trade and services (T1) = 0.139359

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Master urban plan Yes
Urban development plan No obligation
Detailed urban plan No obligation

Ministry of Economy assumes no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.