HR EN
20. Zagreb County

Population: 307.815
GDP per capita: 18.507,00 EUR
Unemployment rate: 4,10%
Average Gross Salary: 1.813,00 EUR
Average Net Salary: 1.327,00 EUR

Distances from traffic infrastructure

Road: Access road needs to be built.
Highway: A2, 1 km
Railway siding: 3 km
Sea port: Rijeka, 173 km
Airport: Zagreb International Airport , 43 km

Companies in the zone

Deceuninck Ltd.
Activity: Production and distribution of PVC profiles
Country of origin: Kingdom of Belgium
Company website: https://www.deceuninck.com/

Swisscolor Ltd.
Activity: Production of paints, varnishes and coatings
Country of origin: Swiss Confederation
Company website: https://www.swisscolor.hr/en/

TBG Beton Ltd. (Heidelberg Materials)
Activity: Production of fresh concrete
Country of origin: Federal Republic of Germany
Company website: https://www.heidelbergmaterials.hr/hr

Clean Room Design Ltd.
Activity: Design and equipping of clean rooms
Country of origin: Republic of Croatia
Company website: https://crd.com.hr/en/home/

Eurokran Ltd.
Activity: Rental and installation of cranes and equipment
Country of origin: Republic of Croatia
Company website: https://eurokran.hr/

DPD Adriatic HUB
Activity: Central distribution and sorting center for parcels
Country of origin: French Republic
Company website: https://www.dpd.com/hr/en/

Business Zone Bistra Download as PDF

General information

Location (city/municipality) Municipality of Bistra
Zone type Business zone
Area of the zone (m²) 1.203.000
Available land (m²) 993.000
Land use Manufacturing and services
Building coverage ratio 0,6
Floor area ratio 0,8
Allowed construction height (m) 15-17
Allowed noise level (at the border of the site, dB) 80
Diagram of the zone
Scanned copy of cadastral plan extract with highlighted available lots

Utility infrastructure

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability Yes
Water purifier Yes

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR/m³) 3.98 (in the construction area); 2.65 (in the business zone)
Communal contribution for office spaces (EUR/m³) 3.98 (in the construction area); 2.65 (in the business zone)
Communal contribution for services (EUR/m³) 3.98 (in the construction area); 2.65 (in the business zone)
Redemption from paying communal contribution fee Yes, Taxpayers determined by special regulations (laws, decisions, etc.) and the Municipality of Bistra, public institutions and companies owned by the Municipality of Bistra are exempted The Municipal Council and the Municipal Mayor may fully or partially exempt from the obligation to pay the utility contribution: - The Republic of Croatia - Zagreb County - A company co-owned by the Municipality of Bistra - Investors who build buildings intended for healthcare, humanitarian activities, social welfare, culture, technical culture, sports, education, national and civil security, infrastructure buildings, energy, as well as buildings for the needs of public institutions
Communal contribution tax
Amount of communal contribution tax (EUR/m²)
Redemption from paying communal contribution tax Yes, The following real estate is completely exempt from paying utility fees: 1. used for public preschool and primary education activities 2. used by state and county-owned health care and social welfare institutions 3. used for fire department activities; 4. used by religious communities for the performance of their religious and educational activities 5. for construction land on which there are memorials, memorial areas and mass graves 6. buildings and land owned by the Municipality of Bistra, or the activity is mostly financed from the municipal budget 7. public traffic and public green areas 8. land on which utility facilities and devices of utility companies for water supply and drainage, for the maintenance of utilities of common consumption, except for office 9. farm buildings of farmers with yards 10. forest land.
Water fee
Water regulation fee (EUR/m²)

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Master urban plan Yes
Urban development plan No obligation
Detailed urban plan No obligation

Ministry of Economy assumes no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.