HR EN
1. Bjelovar-Bilogora County

Population: 98.596
GDP per capita: 13.657,00 EUR
Unemployment rate: 9,40%
Average Gross Salary: 1.594,00 EUR
Average Net Salary: 1.193,00 EUR

Distances from traffic infrastructure

Road: km
Highway: A1, 60 km
Railway siding: 15 km
Sea port: Port of Rijeka, 300 km
Airport: Franjo Tuđman Airport Zagreb, 140 km

Companies in the zone

BIOEL d.o.o.
Activity: Production of biogas
Country of origin: Republic of Croatia
Company website:

Maslenjača Bussines Zone (Đulovac) Download as PDF

General information

Location (city/municipality) Đulovac
Zone type Business zone
Area of the zone (m²) 245.170
Available land (m²) 135.745
Land use Manufacturing and services
Building coverage ratio 0,4
Floor area ratio 0,6
Allowed construction height (m) A maximum of 15 m to the cornice, parts of the building can be higher than 15 m if this is conditioned by technological requirements
Allowed noise level (at the border of the site, dB) 50 dB
Diagram of the zone
Scanned copy of cadastral plan extract with highlighted available lots

Utility infrastructure

Gas
Availability No
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability No
Water purifier No

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR/m³) 0,80
Communal contribution for office spaces (EUR/m³) 0,80
Communal contribution for services (EUR/m³) 0,80
Redemption from paying communal contribution fee Yes, investors who build buildings of exceptional importance for the economic development of the Municipality of Đulovac in areas designated by the Spatial Development Plan of the Municipality of Đulovac for economic, production and business purposes may be partially or completely exempted. The decision is made by the Municipal Council on the proposal of the mayor
Communal contribution tax
Amount of communal contribution tax (EUR/m²) 0,0134
Redemption from paying communal contribution tax Yes, -in the first year of operation, 100% of the amount of the utility fee, -in the second year of work, 50% of the amount of the utility fee, -In the third year, 25% of the utility fee
Water fee
Water regulation fee (EUR/m²) -

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Urban development plan No obligation
Detailed urban plan No obligation

Ministry of Economy assumes no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.