HR EN
20. Zagreb County

Population: 307.815
GDP per capita: 18.507,00 EUR
Unemployment rate: 4,10%
Average Gross Salary: 1.813,00 EUR
Average Net Salary: 1.327,00 EUR

Distances from traffic infrastructure

Road: Ž3036 – 0,0 km
Highway: A2, 7 km
Railway siding: Pojatno railway station - 0.0 km
Sea port: Rijeka , 179 km
Airport: Zagreb International Airport – Franjo Tuđman, 39 km

Companies in the zone

TRANSEURO ADRIA
Activity: Transport, storage, car maintenance
Country of origin: French Republic
Company website: www.transeuroadria.hr

ROFIX
Activity: Production of building materials
Country of origin: Republic of Austria
Company website: www.roefix.com

ZAPREŠIĆANKA
Activity: Trade, marketing, services, tourism
Country of origin: Republic of Croatia
Company website: www.zapresicanka.hr

ARMOMAX
Activity: Fabrication of reinforcement
Country of origin: Republic of Croatia
Company website: www.armomax.hr

NEXE
Activity: Concrete plant
Country of origin: Republic of Croatia
Company website: https://www.nexe.hr/

R-M SPRINT
Activity: Construction of other civil engineering buildings
Country of origin: Republic of Croatia
Company website:

COMMEL – ZAGREB
Activity: Production of other electronic and electrical wires and cables
Country of origin: Republic of Croatia
Company website: https://www.commel.hr/

WEIDMANN IZO-PROD
Activity: Production of insulating parts
Country of origin: Republic of Croatia
Company website: https://weidmann-electrical.com/weidmann-hrvatska/

Pojatno Business Zone (Zaprešić) Download as PDF

General information

Location (city/municipality) Zaprešić
Zone type Business zone
Area of the zone (m²) 491.800
Available land (m²) 71.000
Land use Manufacturing and services
Building coverage ratio 0,6
Floor area ratio production purpose: 2.0, business purpose: 2.4
Allowed construction height (m) Permitted construction height (m) - production: max. 4 above-ground floors or max. 15 m from the ground to the cornice, exceptionally if the technological process requires it, up to 50% of the total floor plan area can be higher (chimneys, silos) - business: max 4 above-ground floors or max 15 m from the ground to the cornice
Allowed noise level (at the border of the site, dB) According to the legal and by-law regulations governing noise protection
Diagram of the zone

Utility infrastructure

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability Yes
Water purifier Yes

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR/m³) 15
Communal contribution for office spaces (EUR/m³) 15
Communal contribution for services (EUR/m³) 15
Redemption from paying communal contribution fee Yes, 10% discount on one-time payment buildings for carrying out production activities are paid for in 60% of the amount of the established value; warehouses are paid in 60% of the determined value; for part of the volume of the underground garage that is being built for the needs of that building and is not intended for renting, or commercial use, which with at least 75% of its volume is located below the surface of the final arrangement and level terrain, and which part is above standard in relation to the conditions prescribed by the spatial plan is paid in 25% amount.
Communal contribution tax
Amount of communal contribution tax (EUR/m²) 0.26 for production activities, 0.45 for other activities
Redemption from paying communal contribution tax No
Water fee
Water regulation fee (EUR/m²) 0.13 for trade and services, 0.03 for manufacturing activities

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Urban development plan No obligation
Detailed urban plan No obligation

Ministry of Economy assumes no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.