Population:
307.815
GDP per capita:
18.507,00 EUR
Unemployment rate:
4,10%
Average Gross Salary:
1.813,00 EUR
Average Net Salary:
1.327,00 EUR
Road:
Ž3036 – 0,0 km
Highway:
A2, 7 km
Railway siding:
Pojatno railway station - 0.0 km
Sea port:
Rijeka , 179 km
Airport:
Zagreb International Airport – Franjo Tuđman, 39 km
TRANSEURO ADRIA
Activity:
Transport, storage, car maintenance
Country of origin:
French Republic
Company website:
www.transeuroadria.hr
ROFIX
Activity:
Production of building materials
Country of origin:
Republic of Austria
Company website:
www.roefix.com
ZAPREŠIĆANKA
Activity:
Trade, marketing, services, tourism
Country of origin:
Republic of Croatia
Company website:
www.zapresicanka.hr
ARMOMAX
Activity:
Fabrication of reinforcement
Country of origin:
Republic of Croatia
Company website:
www.armomax.hr
NEXE
Activity:
Concrete plant
Country of origin:
Republic of Croatia
Company website:
https://www.nexe.hr/
R-M SPRINT
Activity:
Construction of other civil engineering buildings
Country of origin:
Republic of Croatia
Company website:
COMMEL – ZAGREB
Activity:
Production of other electronic and electrical wires and cables
Country of origin:
Republic of Croatia
Company website:
https://www.commel.hr/
WEIDMANN IZO-PROD
Activity:
Production of insulating parts
Country of origin:
Republic of Croatia
Company website:
https://weidmann-electrical.com/weidmann-hrvatska/
| Location (city/municipality) | Zaprešić |
|---|---|
| Zone type | Business zone |
| Area of the zone (m²) | 491.800 |
| Available land (m²) | 71.000 |
| Land use | Manufacturing and services |
| Building coverage ratio | 0,6 |
| Floor area ratio | production purpose: 2.0, business purpose: 2.4 |
| Allowed construction height (m) | Permitted construction height (m) - production: max. 4 above-ground floors or max. 15 m from the ground to the cornice, exceptionally if the technological process requires it, up to 50% of the total floor plan area can be higher (chimneys, silos) - business: max 4 above-ground floors or max 15 m from the ground to the cornice |
| Allowed noise level (at the border of the site, dB) | According to the legal and by-law regulations governing noise protection |
| Gas | |
|---|---|
| Availability | Yes |
| Electricity | |
| Availability | Yes |
| Water | |
| Availability | Yes |
| Sewage | |
| Availability | Yes |
| Water purifier | Yes |
| Communal contribution fee | |
|---|---|
| Communal contribution for manufacturing (EUR/m³) | 15 |
| Communal contribution for office spaces (EUR/m³) | 15 |
| Communal contribution for services (EUR/m³) | 15 |
| Redemption from paying communal contribution fee | Yes, 10% discount on one-time payment buildings for carrying out production activities are paid for in 60% of the amount of the established value; warehouses are paid in 60% of the determined value; for part of the volume of the underground garage that is being built for the needs of that building and is not intended for renting, or commercial use, which with at least 75% of its volume is located below the surface of the final arrangement and level terrain, and which part is above standard in relation to the conditions prescribed by the spatial plan is paid in 25% amount. |
| Communal contribution tax | |
| Amount of communal contribution tax (EUR/m²) | 0.26 for production activities, 0.45 for other activities |
| Redemption from paying communal contribution tax | No |
| Water fee | |
| Water regulation fee (EUR/m²) | 0.13 for trade and services, 0.03 for manufacturing activities |
| County urban plan | Yes |
| Municipal/City urban plan | Yes |
| Urban development plan | No obligation |
| Detailed urban plan | No obligation |
Ministry of Economy assumes no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.