HR EN
20. Zagreb County

Population: 307.815
GDP per capita: 18.507,00 EUR
Unemployment rate: 4,10%
Average Gross Salary: 1.813,00 EUR
Average Net Salary: 1.327,00 EUR

Distances from traffic infrastructure

Road: D1 – 0,0 km
Highway: A2, 1 km
Railway siding: 1 km
Sea port: Port of Rijeka, 127 km
Airport: Franjo Tuđman Airport Zagreb, 127 km

Jablanovec Economic Zone (Zaprešič) Download as PDF

General information

Location (city/municipality) Zaprešić / Jablanovec
Zone type Business zone
Area of the zone (m²) 240.000
Available land (m²) 240.000
Land use Manufacturing and services
Building coverage ratio 0,6
Floor area ratio production purpose: 2.0, business purpose: 2.4
Allowed construction height (m) - production: max. 4 above-ground floors or max. 15 m from the ground to the cornice, exceptionally if the technological process requires it, up to 50% of the total floor plan area can be higher (chimneys, silos) - commercial: max. 4 above-ground floors or max. 15 m from the ground to the wreath
Allowed noise level (at the border of the site, dB) Not forseen in physical plans
Diagram of the zone
Scanned copy of cadastral plan extract with highlighted available lots

Utility infrastructure

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability Yes
Water purifier Yes

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR/m³) 18.00€/m3 (Zone I - between the Krapina River and the highway) 15.00€/m3 (Zone II east of the highway)
Communal contribution for office spaces (EUR/m³) 18.00€/m3 (Zone I - between the Krapina River and the highway) 15.00€/m3 (Zone II east of the highway)
Communal contribution for services (EUR/m³) 18.00€/m3 (Zone I - between the Krapina River and the highway) 15.00€/m3 (Zone II east of the highway)
Redemption from paying communal contribution fee Yes, - 10% discount on one-time payment
Communal contribution tax
Amount of communal contribution tax (EUR/m²) 0.26 for manufacturing activities 0.45 for other activities
Redemption from paying communal contribution tax No
Water fee
Water regulation fee (EUR/m²) 0.13 for trade and services, 0.03 for manufacturing activities

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Urban development plan Created
Detailed urban plan Created

Ministry of Economy assumes no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.