HR EN
11. Požega-Slavonia County

Population: 60.976
GDP per capita: 11.064,00 EUR
Unemployment rate: 6,90%
Average Gross Salary: 1.808,00 EUR
Average Net Salary: 1.334,00 EUR

Distances from traffic infrastructure

Road: 0,1 km
Highway: A3, 26 km
Railway siding: 1 km
Sea port: Port of Rijeka, 287 km
Airport: Franjo Tuđman International Airport Zagreb, 125 km

Companies in the zone

D.E.M. d.o.o.
Activity: Production of EMI/RFI filters and components for household appliances (washing machines, dishwashers, and dryers)
Country of origin: Italian Republic
Company website: www.demdoo.hr

Poduzetnički centar Pakrac d.o.o.
Activity: Business consulting; zone management and support for entrepreneurs
Country of origin: Republic of Croatia
Company website: www.pc-pakrac.hr

Elekta d.o.o.
Activity: Production of electrical components
Country of origin: Italian Republic
Company website:

OEM Korp d.o.o.
Activity: Metal processor
Country of origin: Republic of Croatia
Company website:

Šuma Šugić
Activity: Wood industry
Country of origin: Republic of Croatia
Company website:

Šuma Trans
Activity: Wood industry
Country of origin: Republic of Croatia
Company website:

Ices d.o.o.
Activity: Production of electrical components
Country of origin: Republic of Croatia
Company website:

Zadruga Voćko
Activity: Production of natural juices
Country of origin: Republic of Croatia
Company website:

Drvo promet
Activity: Wood industry
Country of origin: Republic of Croatia
Company website:

Economic Zone Pakrac 1 Download as PDF

General information

Location (city/municipality) Pakrac
Zone type Business zone
Area of the zone (m²) 252.162
Available land (m²) 60.000
Land use Manufacturing and services
Building coverage ratio kig = 0.6 (maximum permissible)
Floor area ratio kis = 2.0 (maximum permissible)
Allowed construction height (m) 15.0 m — excluding parts of the building where the height is dictated by technological requirements. Maximum number of storeys: Basement/Semi-basement + Ground Floor + 2. Ancillary buildings: Basement + Ground Floor, maximum height 4.0 m. Minimum building plot size: 1,500 m² for industrial use; 500 m² for craft and business use; minimum plot width 20.0 m; at least 20% of the plot must be landscaped.
Allowed noise level (at the border of the site, dB) The Detailed Urban Plan (UPU) for the zone does not prescribe a noise limit. The Noise Protection Act and the Ordinance on Maximum Permissible Noise Levels in Environments Where People Work and Reside apply. The specific value for the perimeter of the facility must be confirmed with the relevant department of the City of Pakrac

Utility infrastructure

Gas
Availability Yes
Electricity
Availability Yes
Water
Availability Yes
Sewage
Availability Yes
Water purifier Yes

Communal information

Communal contribution fee
Communal contribution for manufacturing (EUR/m³) 2.65 EUR/m³ of building volume (Zone II, where the "Zona male privrede" [Small Business Zone] street is located). Decision on the municipal infrastructure contribution, Official Gazette of the City of Pakrac 1/2019 — 20.00 HRK/m³, converted at the exchange rate of 7.53450. For manufacturing buildings, a reduction of up to 100% is possible (Art. 13).
Communal contribution for office spaces (EUR/m³) 2.65 EUR/m³ of building volume (the same unit value applies to Zone II). For commercial buildings, a reduction of up to 50% is possible (Art. 13).
Communal contribution for services (EUR/m³) 2.65 EUR/m³ of building volume (the same unit value applies to Zone II). For commercial and open-type commercial buildings, a reduction of up to 50% is possible (Art. 13).
Redemption from paying communal contribution fee Yes, Art. 13 Decisions on communal contribution, by decision of the mayor and based on the contract with the investor. Three mutually exclusive bases: - type of activity: production buildings up to 100%, business and open business buildings up to 50%; – investment amount: up to HRK 5 million 10%, HRK 10 million 20%, HRK 15 million 30%, HRK 20 million 40%, over HRK 20 million 50%; – number of newly created jobs: up to 20 → 10%, up to 40 → 20%, up to 60 → 30%, up to 80 → 40%, over 100 → 50%. Additionally (Art. 15): energy class A+ reduction 25%, class A 15%. Payment: one time with a 10% discount if paid within 8 days, or installments up to 24 installments.
Communal contribution tax
Amount of communal contribution tax (EUR/m²) Municipal fee amount (EUR*/m²) Zone: Zone II; zone coefficient Kz = 0.8; point value B = 0.67 EUR/m² per year (Decision, Official Gazette 8/2022). – production space (HRK 1.50): 0.80 EUR/m² per year – office, service, and retail space (HRK 3.00): 1.61 EUR/m² per year – building land used for business activities (HRK 0.15): 0.08 EUR/m² per year – undeveloped building land (HRK 0.05): 0.03 EUR/m² per year Decision on the Municipal Fee, Official Gazette of the City of Pakrac 9/18, 13/20, 11/21, and 8/22.
Redemption from paying communal contribution tax Yes, There is no automatic exemption for an economic zone as such. The following apply: – Art. 16/3: business premises undergoing reconstruction are exempt from the time of the notification of the commencement of works until the issuance of the use permit, for a maximum of 12 months (application to be submitted within 60 days of the notification of works); – Art. 16/4: undeveloped building land is exempt until the issuance of the building permit; – Art. 16/6: individual exemption for real estate of significance for the City's economic development, granted via a specific general act and a tax decision.
Water fee
Water regulation fee (EUR/m²) – business premises for manufacturing and services (TR 2): 0.4778 EUR/m² per year (0.30 HRK/m² per month) – business premises for trade and services (TR 1): 1.6723 EUR/m² per year (1.05 HRK/m² per month) – open business space (TR 6): 0.0133 EUR/m² per year – undeveloped building land (TR 7.1): 0.0664 EUR/m² per year Decree on the Amount of the Water Management Fee (Official Gazette Nos. 82/10 and 108/13); amounts are in kuna, converted at a rate of 7.53450. Classification into a tariff class based on the NKD (National Classification of Activities) is determined by Hrvatske vode.

Physical plans

County urban plan Yes
Municipal/City urban plan Yes
Urban development plan Created
Detailed urban plan No obligation

Ministry of Economy assumes no legal responsibility for the accuracy or comprehensiveness of the data supplied in this database. Ministry of Economy accepts no liability for any direct, indirect, consequential or incidental damages or losses arising from use of the data collection.